COST ACTION -PEARL PV- APPROVED

By July 21, 2017News

At the end of June, 2017, the COST Action “Performance and Reliability of Photovoltaic Systems: Evaluations of Large-Scale Monitoring Data”, also called PEARL PV got approved.

COST Actions are bottom-up science and technology networks, open to researchers and stakeholders with a duration of four years. They are active through a range of networking tools, such as workshops, conferences, training schools, short-term scientific missions (STSMs), and dissemination activities.

The aim of COST Action PEARL PV is to improve the energy performance and reliability of photovoltaic (PV) solar energy systems in Europe leading to lower costs of electricity produced by PV systems by a higher energy yield, a longer life time eventually beyond the guaranteed 20 years as specified by manufacturers, and a reduction in the perceived risk in investments in PV projects. This objective will be achieved by analyzing data of the actual monitored long-term performance, defects and failures in PV systems installed all over Europe to quantitatively determine the absolute influences of components rated performance, key design of systems, installation, operation, maintenance practice, geographic location and weather factors on the performance, performance degradation over time and failure modes of these PV systems.

For more information and contact data please see :http://www.cost.eu/COST_Actions/ca/CA16235